Lighting Grid Center_1.JPG

Sustainable, Environmentally Advanced, Rapidly Built

High Performance Soundstages

Production Facilities

Constructed in half the time and at a reduced cost of traditional construction methods

Key Features

  • Soundstage Interior Sound Abatement System

    Sound Abatement System

    Multi-layer insulation system combined to provide a sound transmission class rating of STC 48

  • Soundstage Lighting Grid

    Lighting Grids

    Lighting grids with more load-bearing capacity than standard lighting grids

  • Soundstage Interior

    Clear-Span Interiors

    Scalable to 40,000 sq. ft. or greater with stage adjacent production offices.

  • Film Campus

    Full-Service Film Campuses

    One stage or multiple can create a turn-key campus for props, set decoration, hair and makeup, wardrobe, sound stage/lighting grid, mill spaces, storage, and dining facilities.

Customizable Facility Configurations

Our turn-key campuses can be designed in our featured configurations (below) or to fit your custom needs. They are available immediately, delivered quickly, and rapidly constructed anywhere in the world; ensuring production schedules and budgets are met with ease.

Single Soundstage Design

Single

Timeline: 8 months to complete

Double Soundstage Design

Double

Timeline: 10 months to complete

Quad Soundstage Design

Quad

Timeline: 12 months to complete

  • Soundstage Film Campus Rendering

    Conceptualize it.

  • Soundstage Film Campus Construction

    Construct it.

From concept to reality we design and build soundstages to fit the broad range of filming industry needs. Our permanent, clear-span designs are customizable for all film and television production requirements and can be built anywhere in the world. Our team is here to help you plan, customize, and budget for a faster and better way to build. With manufacturing and distribution centers across North America and offices around the globe, our speed of delivery and rapid construction result in much shorter timelines and less expensive project completion.


Follow the construction progression of our Midlothian, TX Film Campus

Soundstage #1 and Mill Spaces

Ground Breaking Date: November 2021

Construction commences on our one-of-a-kind sound stage system and film campus in Midlothian, TX.

Completion Date: June 2022

This is a turn-key production campus encompassing a 24,000 sq ft sound stage with lighting grids, stage adjacent production offices for staff, and four neighboring structures for props, set decoration, mills space, hair and makeup, wardrobe, and multi-purpose space.


Soundstage #2

Ground Breaking Date: October 2023

Construction commences on our second sound stage system on the same film campus in Midlothian, TX.

Completion Date: March 2024

Our client was so pleased with the first custom soundstage they asked CRC to build a second one on the same campus to support growing production requirements. The second sound stage completed in about 5 months is 30,000 sq/ft and features a black Insulquilt lining, custom lighting grid, and shoot cans and was ready to support production needs the day the certificate of occupancy was issued.

Contact Us

Soundstage interior